7 Ply 2000mm Fully Automatic Corrugated Board Plant Machinery, With Servo Motor And PLC Control Cabinet
Payment :
T/T, L/CColor :
Custom MadeShipping Port :
QingdaoLead Time :
4-6 MonthsMin. order :
1 SetTechnical Parameter
Effective width |
2000mm |
Design produce speed |
200m/min |
|
Three layer economic speed |
150-180m/min |
Five layer economic speed |
120-160m/min |
|
Seven layer economic speed |
100-130m/min |
Maximum order change speed |
100m/min |
|
Longitudinal separation accuracy |
±1mm |
Cross-cutting precision |
±1mm |
|
Note: Speed the above targets required to achieve:effective width2000mm, Comply with the following standards and ensure the paper's equipment condition 175 ℃ heating surface temperature. |
||||
Top paper index |
100g/㎡--180g/㎡ Ring crush index(N.m/g)≥8 (Water containing8-10%) |
|||
Core paper index |
80g/㎡--160g/㎡ Ring crush index(N.m/g)≥5.5 (Water containing8-10%) |
|||
In paper index |
90g/㎡--160g/㎡ Ring crush index(N.m/g)≥6 (Water containing8-10%) |
|||
Steam requirement |
The maximum pressure 16kg/cm² |
Common pressure10-12kg/cm² |
use4000kg/Hr |
|
Electricity demand |
AC380V 50Hz 3PH |
Total power≈350KW |
Running Power≈150KW |
|
Compressed air |
The maximum pressure 9kg/cm² |
Common pressure4-8kg/cm² |
use1m³/min |
|
Space |
≈Lmin100m*Wmin12m*Hmin5m(The actual drawing to provider to provide audited prevail) |
Installation & Train
*Manufacturer will arrange 2-3 engineers to install whole production line.
*Buyer supply round air-ticket from Beijing to buyer’s factory fee, arrange lodge , food for engineers and local transport fee and supply 150US dollars fee per day for each engineer.
*Buyer should be arrange translators for train the operators during installing and test.
*Installing and test time: approximate 30 days.
*Help installing workers: at least 6 persons to help installing whole production line.
Quality Guarantee
1. Quality Guarantee period: one year after final acceptance
2. Within the period of quality guarantee, the Seller is obliged to supply technical assistance to the Buyer to ensure normal production. Within the period of quality guarantee, in case of any defects or malfunctions, which have been proven to be caused by Seller’s poor materials, designing errors, and poor fabrication and assembly technology, upon receipt of the Buyer’s information in writing, the Seller will send its technicians immediately.
3. Within the period of quality guarantee, in case of any defects or malfunctions, which have been proven to be caused by the Buyer using improper material, mis-operating and maintenance, upon receipt of the Buyer’s information in writing, the Seller will send its technicians immediately. The international air tickets (if necessary)